Are you asking for the number of bags of gravel needed for one cubic meter of concrete? The unit measure usually used in proportioning the aggregates of concrete are by weights which can always be translated into volume. The unit used for cement are usually in bags. read more
The unit measure usually used in proportioning the aggregates of concrete are by weights which can always be translated into volume. read more
No. of bags required for 01 cum of concrete = 1/0.167 = 6 bags From above, if the concrete mix is 1: 2: 4 ,to get a cubic meter of concrete we require 1.Cement = 6 bags = 300 kgs. read more
FOR 1cubic meter of concrete block ,firstly we must know the mix ratio but if e.g we have the ratio of 1: 2: 4 , 1 is cement 2 is sand 4 is aggregate than we need these quantities for 1 meter cube 0.22 cubic meter cement which is 6.28 cement bags 0.44 cubic meter sand and 0.88 cubic meter aggregates. read more